Custom hotel furniture from China starts with a drawing, not a fair impression. A Foshan factory can make a headboard absent from the catalogue, but cannot guess socket height, preferred hinges or fabric approved by the investor. Anything absent from the drawing and bill of materials becomes a line worker’s decision.

The mock-up room and schedule are covered in hotel furniture from China, with the wider programme under interior fit-out. Your designer signs the drawing. Papillon turns it into a purchase order and verifies that the line can repeat it.

A drawing the line can read

Every room element has its own code. The drawing states:

  • all three dimensions, including passage, air-conditioner height and trim
  • load-bearing material, not only a fabric photograph
  • lacquer code, veneer sample, grain direction and visible side
  • hardware, hinges and runners, with replacement availability in Serbia
  • a joint that disassembles for the container and reassembles in the room
  • left and right sides where rooms form a mirrored pair

The bill of parts accompanies the drawing. If another supplier provides fabric, its deadline becomes the furniture deadline. The factory must not substitute it unilaterally. The purchase order must prohibit material substitution without written approval and define what happens to substituted production.

Quantity thresholds differ across the hotel

Headboards, nightstands, desks and chairs have different minimums. Upholstery tooling for a small series can sometimes cost more than the piece itself.

In practice:

  • group room types so pieces repeat
  • do not introduce a fourth chair model for one suite if an existing model solves it
  • request pricing at full quantity and one-fifth lower to see the threshold
  • import spare pieces in the same lacquer and fabric lot

A hotel with 80 standard rooms and 6 suites must not delay the standard range because of special suite tooling. Separate what is custom from what can be an existing model under furniture imports.

The sample that locks the series

  1. Approve the drawing and materials in writing, not only with a message saying it is fine.
  2. Tie first-piece corrections to a specific edge, hinge or shade.
  3. The second round checks only what the first failed, without new wishes.
  4. The approved piece remains the series reference, not showroom memory.

If you move directly from the first “good enough” to production, the hundredth piece may follow a direction nobody confirmed. You are then correcting the hotel, not the sample.

Changing the drawing after piece approval is a new item with a new sample, deadline and price, not a minor adjustment.

Line visit before a large deposit

A drawing in email does not prove the plant can upholster at the required scale. Factories in China explains line, moisture, packaging and subcontractor checks for finishing.

For a hotel programme, a visit before a large deposit is standard. If you cannot travel, Papillon visits and returns a production-line report. A Lecong showroom shows the piece, while the plant shows whether it can be repeated eighty times.

Packaging the drawing did not see

Custom pieces often break at corners because packaging for that shape is being made for the first time.

  • protect edges the guest will see
  • wrap fabric so it cannot absorb moisture
  • mark the room code so suites are not mixed with standard rooms
  • open several pieces from the middle of the series during QC

Packaging enters volume. A piece that does not disassemble can make the container more expensive, so the designer needs to know before the final shape. Actual cartons are measured on the packaging sample.

What must exist before panels are cut

For each code, prepare:

  • three dimensions and the visible room side
  • material and finish with physical lacquer or fabric samples
  • hardware available in Serbia or a spare set in the same container
  • disassembly and assembly steps the installer can repeat
  • left and right marks where rooms differ
  • fabric supplier, deadline and consequences of delay

If fabric is late, the factory must not choose a substitute itself. A substitute is a different product. The contract establishes this before the deposit, not after the series is upholstered.

Send the drawing or item list with dimensions, room count by type and deadline. If the drawing is unfinished, state which part may be ordered and which must wait. A deposit on an unfinished drawing is a way to prepay changes. Contact.