Hotel furniture from China is not an order for “50 beds from a website”. A hotel has room types, an opening date and a guest who will judge the nightstand edge on the first night. FF&E covers furniture, fixed elements and equipment entering the room as one programme. Skipping samples and the mock-up room is its most expensive saving.
The wider hotel, restaurant and office programme is interior fit-out from China, while retail furniture logistics is covered under furniture imports. Hotel installation is arranged locally.
1. Specification by room type
Without it, every offer describes a different product. For standard, superior and suite rooms, separately state:
- how many rooms repeat
- item list: bed, headboard, nightstand, desk, chair, wardrobe, bench, mirror and luggage rack
- dimensions the room permits, including passage and bathroom doors
- material and finish for hotel wear, cleaning and fabric replacement
- what is fixed and what the guest may move
- room readiness date, including installation
A standard room often has eight to twelve pieces, plus lighting and bathroom. Calling this only “furniture” can produce a bed while omitting the luggage rack. A missing rack in room 40 prevents acceptance of that room.
The designer signs the drawing. Papillon turns the approved list into sourcing. If the drawing is unfinished, the series deposit does not proceed.
2. Material sample, then product sample
First approve the finish: veneer, lacquer, fabric, metal or stone. Keep the physical sample as reference because a later claim that it is the same brown is insufficient.
Then check the most repeated pieces, usually the bed and chair. Look for squeaks, edges that tear bedding, drawers that fall out, lacquer smell in a closed room and whether disassembly can be repeated by installers.
One photograph is not a sample. A sample is a physical piece to which comments are tied specifically, not a general message asking for a slightly darker colour.
3. Mock-up room before hotel-wide quantity
One room, at the factory or on site, should contain furniture, lighting and everything the guest touches. It exposes issues the drawing missed: the nightstand does not fit beside the socket, the chair scratches the wall, the headboard hits the air conditioner or the mirror narrows the passage.
Corrections enter the drawing before ordering the whole hotel. Ordering 120 rooms before testing one turns a correction into a new series and new lacquer.
Use the actual light in the mock-up, open the drawer, lie on the bed, test passage with a suitcase and note lacquer smell after the doors are closed. Tie every correction to a specific edge, hinge or shade. The second mock-up addresses only what the first failed, while new wishes after approval create a new deadline.
Lighting has its own lead time, driver and installation. Parallel plan: lighting imports from China. Ceramics and sanitary ware follow construction-material imports. Wet-area work must finish before upholstered pieces enter the room.
4. Count the series by room
A hotel stops on the missing piece, not the average price.
- every piece has a code matching the room list
- packaging protects edges and fabric, not only the carton’s appearance
- pre-loading QC opens pieces from the middle of the series, not only the first prototype
- the container plan separates room types so suites do not mix with standard rooms
- breakage spares enter the same lacquer and fabric lot, agreed in advance
Spare quantity depends on the piece. An easily chipped edge needs more than a metal leg. Assess it on the packaging sample, not at the port.
Sea is the main route for this weight. China-Serbia transport and the volume calculator help choose 20 or 40 feet. Actual packaging is measured on the sample, not the rendering.
5. What remains outside sourcing
Installation, wall fixing, construction supervision and investor room acceptance are not Foshan inspection. Arrange those people locally or through partners. Our job is to deliver the approved product in the agreed quantity without unapproved finish changes.
Non-catalogue furniture is covered in custom hotel furniture. With a short deadline, suites can use existing models while standard rooms follow drawings. Decide before panels are cut.
Who signs what before the deposit
The designer signs the drawing and dimensions. The investor signs room counts, types and opening date. Papillon turns the approved list into the purchase order, sample and inspection. The installer confirms that pieces arrived intact and assemble as the mock-up showed.
If one confirmation is missing, the series must not start. Most often the drawing is only nearly finished. The factory will cut panels once the deposit arrives, and a later change becomes a new item.
How to start the discussion
Send room counts, types, opening date and item list if available. If you only have reference images, specification comes before the offer. Contact.