Hala sajma u Guangzhouu, izbor faze

Guangzhou fair 2026: which phase to walk

Guangzhou fair 2026 has three spring and three autumn phases. Pick the phase by category before the factory visit, with dates, booth targets and meeting notes.

· Papillon · updated

Fairs · Guangzhou · 2026 · Phases · Sourcing

The Guangzhou fair in 2026 is Canton Fair in Pazhou, divided into three phases by category. Walk the wrong phase and you walk the wrong halls. Dates: 2026 fair calendar and 2027 calendar. Operating guide: Canton Fair.

City map: Guangzhou.

Spring and autumn 2026

Spring runs from 15 April to 5 May 2026:

  • Phase 1

    15–19 April, electronics, machinery, lighting and equipment
  • Phase 2

    23–27 April, home products, furniture, gifts and construction
  • Phase 3

    1–5 May, fashion, textiles, footwear and health

Autumn runs from 15 October to 4 November 2026:

  • Phase 1

    15–19 October
  • Phase 2

    23–27 October
  • Phase 3

    31 October–4 November

The organiser may move dates by a day or two, so confirm before booking flights.

Which phase to choose

One phase per trip. Choose phase 1 for electronics or machinery, phase 2 for furniture from China or home products and phase 3 for textiles, footwear or health.

Do not plan all three phases as one holiday. A hotel near Pazhou saves hours, while a list of 8–12 booths prevents the day disappearing in walking.

After phase 1, the plant is often in Shenzhen or Dongguan, after phase 2 in Foshan and after phase 3 potentially farther from Guangzhou. The transfer needs an address and belongs in the plan, not a last-day taxi.

What a hall day must resolve

The day should establish who the account is, its MOQ and whether the plant can be visited. It does not establish series quality or landed cost. The booth price is usually EXW or a verbal outline, not final warehouse cost.

Build the shortlist 1–3 weeks before flying. For every booth that remains, record who invoices, where the line is and what may change after the sample. If they cannot book a plant, note intermediary. An intermediary can help a small order, but must not be presented as a factory.

Sample after the fair, not a deposit in the hall

A booth piece does not approve the series. A sample you measure or power on comes later, usually in 2–5 weeks, and requires written approval. The deposit waits for specification, packaging and inspection criteria.

QC does not happen in Pazhou. Independent pre-loading inspection is standard in sourcing execution, and sea freight takes about 35–52 days. If the shop opening cannot accommodate the total, narrow the programme to an existing model rather than tooling yet to be built.

Duty is not a reward for attending

The Serbia-China agreement has applied since 1 July 2024. Preference requires an HS code and COO before loading. A fair label is not that document. The offer shows duty with and without the certificate.

LCL and FCL are compared once you know the packed item’s CBM, not while holding a catalogue. Furniture, glass and heavy pallets more often require FCL as quantity approaches a 20- or 40-foot container.

After the hall, before the vessel

The fair report has three lists: who to invite for samples, who remains an intermediary and who to exclude. Fifty business cards are not a result. If two booths give incomparable prices, return to material, dimensions and packaging.

If the plant will not provide an address, the fair remains a catalogue and the series waits for remote verification under the same rule: no deposit until the line is clear. Deciding not to order is a valid outcome, not a wasted flight.

What to do now

  1. Choose a phase, not merely “October in Guangzhou”.
  2. Open the business-trip checklist.
  3. For accompaniment and post-fair visits, see business travel or contact.

Yiwu is a better first step for small goods and lower MOQs. CIIE in Shanghai is not a first fair for imports into Serbia. One phase plus one plant achieves more than three halls without a goal.

Next step

Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.