
Electronics from China carry a heavier brief than housewares: BOM, certificates, NDA, spare parts and QC that checks function, not only looks. Shenzhen and the Greater Bay Area are the hub. Hong Kong fairs open OEM meetings. Papillon joins those two ends to import.
Huaqiangbei is a fast catalogue. Serious OEM lives in plants in Shenzhen, Dongguan and around. A fair in Hong Kong is a meeting, not a line.
A gadget listing without a BOM and certificates is a resale risk in Europe.
OEM builds to your spec and often needs tooling. ODM starts from their design. NDA before drawings. Electronics MOQ is often higher than Yiwu lots.
We coordinate labs and the factory file. We do not invent a CE mark that was not earned.
Air for samples and a small launch. Sea once the sample and QC pass. Landed cost on both.
Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.