Priprema prvog uvoza iz Kine

First China import: from brief to warehouse

First China import for beginners into Europe: what to fix before the PO, customs, LCL, QC and where the first shipment usually breaks and how to avoid it.

· Papillon · updated

Import · Beginners · China · Quality control · Ordering

A first import from China is not ordering on Alibaba and waiting. For a Serbian company the sequence is what you want, who you pay, how goods travel and what customs requires. This article assumes no existing knowledge of LCL, COO or landed cost.

The wider guide with FTA and costs is at Import from China. This is the first-order checklist.

1. Know what you are ordering

Before messaging the supplier, record:

  • product and material, not only a photograph,
  • quantity you can actually pay for and store,
  • target warehouse cost, not only the price in China,
  • when goods are needed in Serbia, not only when the factory says they are ready.

Without this, every offer looks cheap. Buying from China explains ordering, MOQ and payment.

A first import should not contain ten models. Choose one product family, a few variants and one brief. Research over 1–3 weeks shows whether the gate price leaves room for freight and duty. If not, stop before sampling.

2. Company, tax ID and forwarder

Commercial import is handled through a company or sole proprietor. You need a tax identification number (PIB) and a customs broker or forwarder declaring the goods. A private individual and small parcel are a different procedure.

Forwarding moves goods and helps with customs, but does not verify the factory. If you need sourcing and documents, that is sourcing execution plus agreed logistics, not only a forwarder.

The company, tax ID and broker must exist before the invoice, not on container-arrival day. You remain the importer.

3. Do not send all money upfront

A classic mistake is full advance payment to an Alibaba account you have not located. The usual sequence is a deposit after a written purchase order and the balance before shipment or after quality control.

Alibaba and 1688 are useful research tools, not proof you are buying from a factory. Read How to check a supplier.

4. Sample, series, then vessel

A first import fails when the series ships only from a picture. Approve the sample in writing with specification and packaging. Samples take 2–5 weeks and do not oblige you to continue if they fail.

Perform QC before the vessel and link the balance to the report, not a message that goods are ready. A Belgrade claim is late and expensive. Checklist: QC before shipment.

5. LCL or full container

A first import rarely fills a 20-foot container. LCL means a shared container and cost partly calculated by volume. FCL makes sense when you have enough volume for 20 or 40 feet.

Sea freight takes about 35–52 days. Air is for samples and urgent goods at a higher price per kilogram, not cheap import. Read more: China-Serbia transport.

The first shipment should have one shipper, one invoice and one packing list. Add a second shipper and mixed LCL on a later batch once the first succeeds.

6. Duty is not zero by itself

Duty depends on the HS code. The Serbia-China FTA in force since 1 July 2024 can reduce the rate, but only with a valid COO. Without it, standard duty applies, while VAT is separate.

Do not learn this at the terminal. Serbia-China FTA and landed cost are essential before confirmation.

7. One figure for the decision

The cost of import cannot be answered without the total: goods, forwarding, duty, VAT and fees. A unit price alone is not an import offer.

Landed cost is the only figure to compare with the sales price. An MOQ you cannot pay for and store stops the order before correspondence.

Common first-import mistakes

  • assuming an order from China already includes customs,
  • trusting the lowest offer without plant verification,
  • resolving the HS code when the container arrives,
  • confusing the forwarder with the sourcing agent,
  • skipping QC so goods arrive faster.

What to do now

  1. Read Import from China and the import process.
  2. If choosing who to pay, read Buying from China.
  3. Send a brief via contact with product, quantity and deadline.

Papillon is registered in Hong Kong and works in factories in China. For a first import, one team can manage the factory-to-warehouse sequence when you need sourcing execution. If you already have a forwarder, supplier selection happens earlier.

Next step

Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.