Textile imports from China most often fail on colour, fabric weight and seasonal timing, not inexpensive cotton. Guangzhou, including Baima, Shahe and Zhongda, and Canton Fair phase 3 are natural starting points. Papillon treats textiles as a specification, not a WeChat photograph.
The import chain is described under Import from China, with the cluster at Guangzhou. The wider category framework is textile imports from China.
Where to search
Zhongda
fabrics and production accessoriesBaima and Shahe
ready-made clothing and faster cyclesCanton Fair phase 3
fashion, textiles and footwear, spring 1–5 May 2026 and autumn 31 October–4 November
The 2027 season is on the fair calendar. The factory may be in Guangdong, Zhejiang or further away. A Guangzhou booth is not the line. Read more: Factories in China.
Specification required in the purchase order
- Composition and fabric weight, not only cotton
- Pantone code or laboratory colour sample, not only an image
- Fabric width, shrinkage and pilling
- Composition label, hangtag and unit packaging
- AQL for seams, stains and measurements
Before the deposit, also include pattern dimensions for clothing and the metre or piece quantity in the first lot. The fabric standard stays with you and the plant. Screens change shades, while another dye batch is not the same roll even with the same colour code.
Without a laboratory colour sample, a Belgrade claim can cost the entire season.
MOQ and samples
Textile lines favour volume. Dyeing MOQ often exceeds the first collection. Reduce colour count or accept a higher price per metre. Decide before sampling, not once the season has started.
A stock sample and production sample are not the same. Approve the production sample before cutting. Colour and pattern samples take 2–5 weeks, while shortlist research takes 1–3 weeks.
Custom patterns and existing models have different lead times. A new pattern or tool adds time and belongs in the offer before the deposit, with clear ownership when you pay for it.
Bale QC, not only packaging
Textile QC opens an agreed sample of bales. It checks stains, shade differences within the same lot, measurements and composition. This inspection is standard in sourcing execution before shipment. The container is not sealed if the standard and bale disagree.
Rework in Guangdong costs less than a collection that looks like two products in-store. Spares come from the same lot in the first bale. A new order a month later is a new risk.
Packaging protects against moisture. LCL mixes your roll with other goods and increases handling. FCL makes sense when metre volume approaches a 20- or 40-foot container or moisture costs more than empty space. CBM is measured on the bale, not the catalogue metre.
Duty and labels
The HS code depends on composition. Cotton, polyester and blends are not the same declaration. The agreement in force since 1 July 2024 requires a COO when claiming a lower rate. Request the COO before loading, and zero duty is not a textile property.
Landed cost per metre or piece adds goods, freight, duty, VAT and colour defects. The offer includes both duty scenarios.
Composition labels must follow the specification. If customs reads a different composition from what QC measured, the dispute costs more than a metre of fabric. Composition on the purchase order, label and invoice must be identical. Where laboratory work is needed, it happens before label printing. Papillon does not invent fibre percentages.
The season does not wait for dyeing
Sea freight takes about 35–52 days. Research, samples, production and sea must fit the seasonal calendar. If they do not, do not order that colour for that season.
If the colour standard is late, do not push the series merely to reach the shelf. A late colour is a different collection. Fewer models in the correct shade beat a full rail that looks like two products.
What Papillon does
Papillon covers shortlisting, visits, samples, QC, documents and sea freight. You decide the collection and margin. We do not design the brand for you, but manage the chain so the season does not arrive before the goods.
Next step
Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.



