Restaurant and café fit-out from China most often fails on the part guests use hundreds of times a month: the chair, table, bar or tap. A residential furniture catalogue is insufficient. Hospitality requires durability, replacement parts and a schedule aligned with opening.
The hotel, restaurant and office programme starts with interior fit-out from China. This article covers the dining room, bar and wet area. We do not design the interior or manage tradespeople, but import what the specification states.
Chairs and tables that survive a shift
A café chair is not a living-room chair. On the sample, have someone sit, drag it across tiles, spill water and leave it overnight. If the finish whitens or a leg squeaks on the sample, the series will repeat it.
Check:
- weight and stability on uneven tiles
- wear points: upholstery, seat edge and leg joints
- whether covers or seats can be replaced without a new chair
- whether the table tolerates spilled drinks and its top can be replaced
- whether chairs stack when the venue has no storage
Factory minimums often exceed one venue’s seating. If the factory requires 200 pieces and you need 40 pieces, combine venues, accept a higher small-batch price or choose an existing model. Do not order 200 pieces merely to create stock before the venue operates.
Spare chairs belong in the same fabric lot. A later order can bring a different shade just when the first chair breaks. Part replacement must exist in a document with a code, not a verbal promise.
A bar measured against the wall, not the catalogue
A bar requires on-site dimensions. The drawing must include worktop height, kitchen transition, machine space and the guest’s approach side. Metal can arrive accurate to the offer but wrong for the wall. A later correction is a new item.
Metal and stone are packed differently from chairs. A pallet corner can break a slab that looked intact in a photograph. Pre-loading inspection opens the packaging, while counting labels is insufficient.
If the bar is custom but chairs can be existing models, do not let the bar control the chair deadline. Separate what must wait for measurement from what can start earlier.
Sanitary ware before fabric
Tiles, basins and taps do not come from the same factory as chairs and must not delay the tiler. Calibre and shade are locked on a physical sample under venue lighting. Another pallet of similar grey becomes visible on the wall.
The breakage, pallet and HS-code chain is under construction-material imports. Wet-area work must finish before furniture enters the dining room, otherwise fabric gathers construction dust.
Taps need spare parts and tiles need spares from the same firing batch. Both belong in the first order, not a later order once the wall is finished.
Light above the table
Guests photograph the table, so lighting that buzzes or changes colour appears in that image. Lighting has its own sample and lead time. Lighting imports from China run in parallel.
Do not pack a chandelier with chairs if it comes from another factory and the glass needs different packaging. Test the light with the table instead of adding it to the last container if space happens to remain.
Work backwards from the opening date
- Installation and small on-site corrections.
- Unloading and quantity verification by code.
- Sea freight and customs.
- Production after sample approval.
- Sample and corrections.
- Specification.
If there is insufficient time between today and opening for all these steps, reduce the number of custom pieces. Existing chair models arrive faster, while custom products cannot fit a deadline that has already passed.
A 60-seat room with non-stacking chairs occupies more space than owners often expect. The volume calculator is a guide, while actual packaging is measured on the sample.
What belongs in the first brief
State the seat count, what is custom, what can be an existing model, whether sanitary ware belongs in the same programme and the opening date. If the date cannot accommodate samples, say so immediately. Contact.
Next step
Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.