Shenzhen poslovni put

Shenzhen sourcing trip: visits and follow-up

Check list for a Shenzhen business trip: visa, meetings, factories, samples, payments, data safety and 14-day follow-up for electronics buyers and QC.

· Papillon

Shenzhen · Travel · Sourcing · Check list · Electronics

Shenzhen connects electronics, equipment, prototype development and Dongguan’s manufacturing belt. A business trip without a checklist easily becomes expensive improvisation. This guide is for Serbian companies visiting to verify and select suppliers, not merely see the city.

Trip goal before the ticket

Define one sentence of success, for example:

  • shortlist two PCB assembly partners and approve an engineering-sample plan, or
  • verify an existing factory and agree a QC protocol for the third-quarter series.

Without a goal, showrooms fill the calendar. Context: China sourcing.

Two to three weeks before departure

  • Visa and entry rules checked
  • Hotel near meetings in Nanshan, Futian or Bao'an according to plan
  • Business WeChat profile ready
  • Specification, bill of materials and test criteria in PDF and offline
  • NDA template when sharing intellectual property
  • Factory list with addresses and contacts
  • Interpreter or local agent where needed
  • Budget for samples, taxi/Didi, courier and business dinners

Include flights, hotel, transfers, local team, samples and hospitality. A 10–15% contingency covers another day if verification rejects the first factory.

Mobility and daily rhythm

Traffic and distances deceive on the map. Plan at most two serious audits per day. A Dongguan visit takes a full day, not a stop on the way. Combine metro and Didi and leave buffers for rain and traffic.

Example four-day plan:

  1. Meetings in Nanshan and Futian, then evening analysis.
  2. One or two factories in Shenzhen or Dongguan.
  3. Follow-up negotiations and sample handover.
  4. Buffer for additional verification or return.

An overcrowded calendar creates superficial checks. Fewer visits with more evidence work better.

At the meeting and audit

  • Business licence and address confirmed
  • SMT, line and QC station seen live
  • Antistatic packaging and electronics storage where needed
  • Lot traceability
  • Capacity against your forecast
  • Photos and video with permission
  • Names of the people deciding price and quality

With permission, record the entrance and company name, working line, inspection area, finished-goods warehouse and carton mark. Organise folders by supplier on the same day.

Detailed framework: Supplier verification.

Samples and intellectual property

Do not leave your only drawing copy without recording what you shared. Pay for a sample with clear acceptance criteria. Every engineering change must be written.

Be punctual at meetings, state the quantity range and never promise a purchase order you will not place. If you request an NDA, expect it to apply both ways. A reliable reputation opens more than aggressive haggling in the first ten minutes.

Read more: MOQ, samples and tooling.

Payments and commercial terms

Do not carry large amounts of cash. The deposit follows the contract and legal-entity verification. The invoice name must match the business licence and bank account.

Agree an FOB port such as Shekou or Yantian, or EXW if you consciously accept earlier organisation and risk. Never accept a price without an exact delivery point.

Special electronics rules

  • Request certificates and reports, not only a verbal claim of CE.
  • For batteries and air freight, check UN38.3 and other documents.
  • Record firmware versions and change-control rules.
  • Agree after-sales service and product returns.

QC does not replace a laboratory. It confirms that the series matches the tested model.

Documentation for later import

During the trip, ask who issues FTA origin proof and how far in advance it must be ordered. The FTA has applied since 1 July 2024: FTA.

Align the HS code and COO status before shipment. If the aircraft arrives before the documents, goods wait at the airport warehouse.

Safety and logistics

Carry a power bank and offline maps. Do not keep every password only on your phone. Secure the passport and copies and agree an evening message with your Serbian team.

Arrange late hotel checkout if the audit runs late, a company invoice for business expense and stable internet for video calls. Book the morning Dongguan transfer a day ahead.

After the trip: first 48 hours and 14 days

Within 48 hours, enter notes, score suppliers against identical criteria, send RFQs to the best two or three, order samples and internally assess price, timing and risk.

By day fourteen, close the shortlist and next step. A concise message can read: “Thank you for the visit. We are sending revised specification v1.2. Please provide a formal FOB offer for the named port, sample lead time and confirmation that you can issue FTA origin proof. The response deadline is the stated date.”

Process: Import process and Sourcing guide.

When to bring a local team

For a first trip or several factory checks, a local partner shortens travel and filters addresses that are only showrooms. Compare customs broker or ground team.

Shenzhen rewards preparation: a clear goal, a small number of deep audits and fast follow-up. Improvisation is paid for in deposits and delays.

For factory schedules, audits or accompaniment, write via contact with your SKU list and preferred dates. We will turn the checklist into a concrete trip plan.

Next step

Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.