From 1 July 2024 the free trade agreement between Serbia and China is in force. That matters for importers. It is not a magic switch “duty = 0 on everything”. Preferential treatment depends on the HS line, origin rules and correct documents, most often proof of origin / a certificate of origin (CO) in the form Customs accepts.
This text is practical: what to ask the supplier, what to check with the broker, and where firms fail.
What the FTA is, and is not
It is: a frame to cut or remove duty on goods that meet the agreement, with proper origin.
It is not:
- automatic deletion of VAT,
- a guarantee for every HS code,
- a substitute for correct classification and declaration,
- “whatever the invoice says”.
Illustration: if the standard duty for your product is 5–10%, and the preferential rate is 0% or reduced, saving on a 50,000 EUR customs base can be illustrative 2,500–5,000 EUR, if you have the right to preference. Figures differ by HS. Always confirm with the customs broker.
More context: Serbia-China FTA.
Why origin is critical
“From China” on the invoice is not enough. Goods must meet origin rules (wholly obtained / sufficient processing / cumulation where it applies). If a critical part was imported into China and only repacked, preference can fall.
That is why QC and a bill of materials are not only quality. They affect customs treatment.
What to ask for
In practice, ask the supplier:
- Which form / electronic proof applies to your shipment in Serbia (confirm with the broker, requirements tighten in use).
- Exact goods description aligned with the invoice.
- Correct quantities, weights, HS (where stated).
- Stamps / authorisations of the export side as required.
- Issue timing, before or with shipment, not “when the vessel reaches Piraeus”.
A late CO often means you pay the full rate or enter a procedure that costs time.
Operating sequence
- Preliminary HS: with broker / customs adviser.
- Preference check: whether the tariff line benefits under the FTA and on what condition.
- RFQ with a CO ask: put in the contract that the supplier provides origin proof.
- Production: no material change that breaks origin without notice.
- Before loading: draft CO plus invoice plus packing list aligned.
- Declaration: the broker uses preference only if the file is complete.
Import flow: Import from China.
Three documents must tell the same story
| Document | Must match |
|---|---|
| Commercial invoice | Description, value, Incoterms, pairs |
| Packing list | Cartons, NW/GW, dimensions |
| CO / origin | Description, quantities, exporter, origin |
Customs likes consistency. “Gift / sample value” games on commercial shipments are a bad idea.
Frequent mistakes
- Assuming the FTA covers the whole catalogue without an HS check.
- Asking for CO only when the container is on the water.
- Different company name on CO and invoice.
- Vague description (“parts” instead of the actual product).
- Mixing goods of different origin in one declaration without a clear split.
- Counting landed cost only with “0% duty” and no fallback.
Landed with and without preference: Landed cost and 50,000 EUR example.
Contract with the supplier
- Obligation to issue valid origin proof for every shipment.
- Deadline (for example before BL draft).
- Liability if the document is late or rejected for their error.
- No material changes without approval.
This matters especially with trading companies that combine several plants.
Illustrative scenario (not a guarantee)
Purchase 40,000 EUR FOB, customs base after freight and insurance for example ~45,000 EUR.
Scenario A
full duty 8%, ~3,600 EUR duty (plus VAT on the base).Scenario B
preference 0% with valid proof, 0 EUR duty (still count VAT by the rules).
The gap is illustrative: your HS can have different rates. The point: paperwork is money.
For every China shipment above an agreed threshold (for example 10,000 EUR): HS confirmed, FTA check done, CO obligation in the PO, document drafts 5 days before planned sailing, archive 5+ years or per your tax policy.
If preference fails at control, options depend on the case: extra papers, pay standard duty, correction with professional help. Always keep a no-preference scenario in landed cost. Do not plan margin on 0% until you have a routine of successful shipments.
For help aligning documents with the supplier or an indicative landed scenario (with/without preference), write via contact with an HS frame and goods description.
Next step
Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.

