Hol sajamskog centra sa oznakama hala

Global Sources Hong Kong, OEM and ODM

Global Sources Hong Kong runs in April and October, in several phases at AsiaWorld-Expo. It is for buyers who need a maker that can scale, not only a catalogue carton. Papillon is registered in Hong Kong. We walk one phase, cut a list, then visit plants in Shenzhen or Dongguan. The fair is the meeting. The line is on the mainland.

Phases, not one weekend

  1. April

    Spring phases

    Category windows. Electronics is not the same days as gifts or home.

    AsiaWorld-Expo

  2. October

    Autumn phases

    Same month as Hong Kong Electronics. Different organiser, different building.

    AsiaWorld-Expo

  3. After

    Plant visit

    Tooling, capacity and certificates. This is where a trial becomes a series, or stops.

    Shenzhen, Dongguan

Worth the flight

  • You need OEM or ODM, not a trader catalogue.
  • A trial quantity and a scale quantity are both real.
  • You can spend the next day in a plant.
  • Materials, tooling and certificates are in the request.

Skip this fair

  • You need 200 mixed pieces and a low MOQ. Start in Yiwu.
  • You will walk every October phase.
  • You wanted HKCEC and booked AsiaWorld-Expo by the month.
  • A prototype is something you hope to invent on the stand.

How Papillon runs a phase

One category window, a short list of makers, then the plant that would have to hold the series.

  1. Pick one phase

    The fair is several shows. Your category gets one window. The others are someone else's trip.

  2. Ask who scales

    Trial quantity, scale quantity, lead time, and whether the sample on the table is from their line.

  3. Visit the line

    Shenzhen or Dongguan, the address they named. Capacity you cannot see does not go in the report as fact.

  4. Price the series

    Landed cost before deposit. A unit price at the booth is not the cost in your warehouse.

Who this fair is for

Brands and trading teams that already know the product and need a factory that can repeat it. You bring a materials note, a view on tooling, and the certificates the destination asks for.

If the order is a few hundred mixed pieces, Yiwu is the faster first step. If the order is a trial that must become thousands of the same model, this hall is closer.

Papillon uses it when the request says OEM or ODM in the first line, not as a synonym for any fair in Hong Kong.

One phase is the visit

April and October each break into category phases. Walking all of them is how a buyer stops asking questions and starts collecting bags. We book the phase that matches the product and leave.

October also holds Hong Kong Electronics Fair at HKCEC. Same city, different job. Pick the meeting fair before you pick the hotel.

The wider map is China trade fairs 2026.

Trial, then scale

A useful stand can talk about the trial build and the series without changing the story. Tooling cost, who owns the tool, lead time, and what happens when a part is short.

NDA before you put a design on the table. A prototype that appears from a catalogue SKU with your logo is not development. We say so in the hall, not after the deposit.

AsiaWorld-Expo is not the factory

The airport venue is efficient and it is still a hall. The line is in Shenzhen, Dongguan, or further into the delta. We do not end the trip at the expo if the request is a series.

QC stays on that line, before loading. Sample time is about 2–5 weeks when you do not already hold an approved piece. The ship is still about 35–52 days.

What the report decides

Who can scale. Who was a trader with a nice booth. What the landed cost looks like at the trial quantity and at the scale quantity. Whether the next step is a prototype, a sample order, or a stop.

The fair does not owe you a supplier. It owes you a shorter list than you walked in with.

Frequently asked questions

Several phases in April and several in October, at AsiaWorld-Expo. Pick the phase for your category. Do not plan to walk the month.

No. Different organiser and a different venue. Hong Kong Electronics Fair is at HKCEC. Choose one meeting fair.

Do not. One category, about eight to twelve meetings, and days left for Shenzhen.

For mixed small goods and a low MOQ, yes. For a maker who must repeat one model at scale, Global Sources is the closer fair.

Next step

Send the request: category, quantity, and date. You get a reply within 24 hours, with an outline of the total cost to destination where we can price it.